Measurement that supports the drawing
Inspection planning starts at engineering review. Critical dimensions, measurement methods and reporting formats are agreed before tooling and production begin.
Coordinate measuring and verification
Two ZEISS coordinate measuring machines, supported by a ZEISS microscope, Nikon profile projector and height gauges. These resources cover die components, tryout samples and production parts.
Planned, not assumed
Every project gets a defined inspection plan: which features are measured, on which equipment, at what frequency and in which report format.
Reports supplied against the agreed inspection plan
Inspection scope, sampling frequency, reporting format and acceptance criteria are agreed with the customer before production starts.
First Article Inspection
FAI records for tryout samples and initial production parts, measured against the approved drawing.
CMM Dimensional Reports
Coordinate measuring results for critical features, available as a redacted report for customer review.
Material Certificates
Mill certificates and incoming material verification records for the specified material grade.
PPAP / APQP Support
Submission level, control plan and documentation scope agreed project by project.
In-Process Control
Defined in-process checkpoints during stamping production, with batch traceability and recorded results.
Customer Audits
Factory audits and NDA-backed drawing review can be arranged by appointment.
Documentation available on request
Inspection records and quality documents are issued for the legal entity named in the quotation. Ask our team which documents are available for your project when you submit an inquiry.
We do not publish third-party certificates or customer names on this site. Quality requirements for each project are recorded in the agreed inspection plan rather than described as a blanket guarantee.
REQUEST DOCUMENTATIONOur quality approach
Quality is planned at the drawing-review stage: critical dimensions, measurement method, sampling and reporting format are fixed before tooling starts. That makes the first-article review a confirmation against agreed criteria rather than a new negotiation.
SEE THE RFQ CHECKLIST →Coordinate measuring and dimensional inspection
ZEISS coordinate measuring equipment and probe measurement in progress at our inspection workstation.




Ask for a sample inspection report
Tell us which features matter on your drawing. We will show how we would measure and report them.